Youdu Capital · Primary-Market Financing
The 行家说三代半 author column on EET-China reported on 2026-11-02 that 芯联动力 (Xinlian Dongli) had completed a new financing round. Manufacturing financing news raises a budgeting question for unlisted technology companies preparing to increase output: a delivery target does not yet determine the materials budget. When a bill of materials records only net finished-product content, procurement payments must still cover the materials actually put into production. Materials that never reach qualified delivery also consume cash.
For overseas background, an announcement carried by EquityBulls on 2026-10-29 stated that Axiro was the lead investor in ThinSiC’s latest financing round. Only the financing fact is cited here; it does not establish any company’s production yield or costs. As a financial adviser, Youdu Capital serves only domestic financing for unlisted Chinese technology companies and does not provide cross-border financial services. The following is a budgeting analysis of a hypothetical production process, not a description of these companies’ operations.
Consider a product that passes through successive processing stages and a final inspection, with some input ultimately failing qualification and unable to be recovered at its original cost. The starting point here is the net material content of a finished product before process losses have been allowed for; if a cost standard already includes losses, do not add them again. Multiplying deliveries only by this net material content omits process consumption. Materials already paid for do not return to the bank account because no finished item enters inventory. Financing needs therefore depend on the conversion from purchased input into qualified deliveries.
The first cause is the location of the loss. An item identified as nonconforming early can be kept from further processing; an item rejected at the end has already absorbed materials added in earlier stages. A final qualification ratio alone may not explain where the materials payments went. The same number of rejected items can consume different amounts of already committed material depending on the stage of rejection. They cannot all be valued simply at the original raw-material price.
The next layer concerns how an unachieved yield improvement can enter a financing model twice, through deliveries and lower costs. A team may plan sales using higher qualified output while also reducing its procurement budget to reflect lower losses. If those improvements have not occurred in the relevant batches, both improvements rely on the same unverified condition. If it fails, higher materials payments and a delivery shortfall may occur together.
This does not mean that both improvements cannot be real. Once a process stabilises, the same input may produce more qualified items; with deliveries held constant, less input may be needed. Financing materials should first specify the comparison being made, then show the batches and stages in which the improvement applies. They should not assume unchanged input and more deliveries on the revenue side, unchanged deliveries and less input on the spending side, and simply add the two benefits together.
A use-of-funds schedule can begin with actual batch records. Retain materials input, movement between stages, qualified inventory receipts and the disposition of rejected material, distinguishing observed losses from planned reductions. The purpose is not another production report. It is to trace procurement payments to actual consumption: material in deliverable products, material still being processed, and material no longer usable for the original delivery. One finished-product cost cannot stand in for all three.
Recovery value also needs a separate check. Reworkable does not mean no further materials purchases, and recoverable does not mean cash is received immediately. A recovery has a basis for entering the cash forecast only when its use, additional inputs and timing can be explained. Unconfirmed scrap proceeds should not be netted against the funding gap at the original procurement cost. No universal loss rate is offered here; companies should use their own records and identify missing information.
In financing discussions, hold one set of delivery targets constant and show materials needs under the conversion relationship already observed, alongside changes if process improvements materialise. Investors can then discuss how much actual input is reduced and the supporting evidence, rather than debating the abstract claim that scale reduces costs. If the scenarios differ substantially, identify the materials spending needed to obtain new batch records, explaining the progress this round would fund.
Over the next three to six months, if successive batches show fewer late-stage losses, update input budgets within the relevant production scope and check whether materials purchases actually fall. If losses merely move from later to earlier stages without increasing qualified delivery, explain that the saving comes from avoiding subsequent materials additions. These changes have different operating meanings and should not both be presented as the same leap in output.
Another scenario is an increase in delivery commitments before a new conversion relationship has been established. First test available cash against input needs supported by evidence, then discuss which batches can proceed in stages. If additional input is required to maintain deliveries, restore the extra procurement to the use of funds and payment calendar. Raising forecast yield alone should not be used to balance the budget. Preserve an order for adjusting activity without assigning invented probabilities to improvements that have not occurred.
This preparation does not judge the merits of a technical route or constitute quality certification. It asks what has already been consumed, and what remains payable, to obtain deliverable products under stated production assumptions. Explaining where losses occur and where inputs go gives the financing amount a materials basis that can be checked. This is a discussion of general financing methods, not specific investment, legal or tax advice, and it promises no financing or operating outcome.
Sources 行家说三代半:芯联动力新一轮融资(电子工程专辑刊载) (2026-11-02) https://www.eet-china.com/mp/a536177.html EquityBulls: Axiro investment in ThinSiC announcement (2026-10-29) https://www.equitybulls.com/news/378033/axiro-semiconductor-invests-in-thinsic-to-strengthen-position-in-nextgeneration
Content note: This article was drafted with AI assistance and reviewed through an independent AI process, using the listed public sources. It contains no original interviews, and no first-hand testing of the products, services or methods discussed was conducted. Checking public sources is not a field investigation or first-hand experience.